22 July 2013 at the well number 8, pad number 1 of the Karasevskoye deposit, the Directional drilling Department team for the company "Tomskneft" drilled the first horizontal well with a horizontal hole of 1000 meters length without using any rotary drive systems, technically that was a very complex process.